Status: Under Construction

MoPac Expressway to Brodie Lane

Dec. 19, 2025 Status Update: Construction on this segment of Slaughter Lane between MoPac Expressway and Brodie Lane remains underway. Poles for crosswalk signal (pedestrian hybrid beacon or PHB) anticipated to arrive on site at Briar Ridge Drive in early January 2026 with activation by late January 2026.

 

About the Project

Current Work Zone

Slaughter Lane work zone 11-2025

View interactive map

 

Work Area

Improvements will be constructed on Slaughter Lane between Loop 1 (MoPac Expwy) to Brodie Lane.

 

Scope of Project

Enhancements include an expanded six-lane divided street from MoPac Expressway to Brodie Lane.

Modernized signals and pedestrian improvements at intersections like Brodie Ln. and Bowie High School. The Zuniga Drive intersection will also feature a new Pedestrian Hybrid Beacon and safety-focused changes.

Shared-use paths for pedestrians and cyclists; curb extensions for safer crossings, and drainage upgrades including storm water detention and water quality structures.